The finder never bids on the removalContractors licensed and insured for the job(315) 640-3590
$100 off your first job, credited by us. Terms apply.

Miami, FL

Mold Remediation in the City of Miami, Filed With the Right Office

Remediation takes out what the protocol says has to go, drywall, baseboard, insulation and cabinet backs, behind containment, and hands the space back ready for an independent check and a rebuild filed with the correct building department.

10 square feetThe size above which Florida law defines mold assessment and mold remediation as licensed work
12 monthsHow long Florida bars an assessor from remediating what it assessed, and the reverse, with a general contractor exception
33.8%County-wide share of housing units in buildings of 20 or more units, per Census estimates for 2020 to 2024
Get In Touch

Mold Remediation quote in Miami

Tell us what you can see or smell, where it is, and whether it is a condo or a house. Those three answers decide who you need and who is likely responsible, which matters more here than the size of the stain.

Would you rather talk it through? Call (315) 640-3590.

$100credit

$100 off your first job

Credited by us on your first booked job.

  • One credit per customer per property, on your first booked job.
  • Valid through December 31, 2026.
Start Your Quote

Mention this offer when you book. Full terms.

Six short questions, then your details. Under a minute, and they are the questions that decide who you actually need, and who is likely responsible.

Question 1What are you dealing with?
Question 2What kind of building is it?

In Miami-Dade this changes who hires whom. In a condo or townhouse the association may be responsible for part of the building and you for the rest, so the first answer we give depends on this one.

Question 3Where do you think the water came from?

If it came from a neighboring unit or from the building itself, say so. It usually decides who pays, and a written finding about the source is worth having before anything is removed.

Question 4Is anything still wet?

EPA guidance is to dry wet materials within 24 to 48 hours. Inside that window this is usually a drying job. Past it, it may be a mold job.

Question 5What is your connection to the property?
Question 6How soon do you want someone on it?
You, and the property this is about

Who should we ask for?

How can we reach you?

We call to confirm the details before anyone is sent out.

Where is the property?

The contractor match is by property, not by person, so the street line matters.

Anything else we should know?

Your $100 credit is attached to this request. Mention this offer when you book. See terms.

Your details are used only to respond to this request and arrange the service.

Deciding

City of Miami or county, board or owner: settle it before removal

In a condo, Florida's condominium act says a unit owner may undertake reconstruction on the unit only with the board's prior written consent, and the board may set conditions on the repair method, the contractor's qualifications and the contract. Ask for those conditions in writing first, since insurance certificates, working hours and elevator bookings all flow from them. Then check the permit route. The 2026 small-project permit exemption does not reach units in multi-family buildings at all, so a tower unit's rebuild should be priced on the assumption that a permit is needed.

  1. Which folio code the property carries

    01 means the City of Miami's building department; 30 means Miami-Dade County's. A contractor who files in the wrong office costs you days in an opened-up unit.

  2. What the board has asked for

    The board's written consent can come with conditions on method, contractor and contract. Get them before a scope is priced, not after.

  3. Whether the protocol came from someone else

    The remediator should be working to a separate licensed assessor's written scope, not to one it wrote itself. Florida bars one company doing both on the same structure within 12 months.

How mold remediation works →

Local Detail

Miami folio codes and tower housing, sourced

Knockdown ceiling with a brown ring water stain beside a recessed light

The Miami-Dade Property Appraiser's folio chart gives each municipality a two-digit code as the first two digits of the folio: 01 Miami, 02 Miami Beach, 03 Coral Gables, 04 Hialeah, 06 North Miami, 08 Opa-locka, 10 Homestead, 24 Key Biscayne, 25 Sweetwater, 28 Aventura, 32 Miami Lakes, 33 Palmetto Bay, 34 Miami Gardens, 35 Doral and 36 Cutler Bay. 'Code 30 indicates properties in Miami-Dade County not within the municipality, otherwise referred to as unincorporated.' Kendall does not appear on the list.

Source: Miami-Dade County Property Appraiser, Folio Numbers, accessed 2026-09-23

The City of Miami has 223,826 housing units in the ACS 2020 to 2024 estimates. 48.8 percent are in buildings of 20 or more units and 22.4 percent are single-family detached. 69.2 percent of occupied units are renter occupied. 7.8 percent of units were built in 1939 or earlier and 50.8 percent before 1980.

Source: US Census Bureau, American Community Survey 2020 to 2024 5-year estimates, table DP04 Selected Housing Characteristics, Miami city, Florida, accessed 2026-09-23

Section 718.111(11)(g)1: 'All reconstruction work after a property loss must be undertaken by the association except as otherwise authorized in this section. A unit owner may undertake reconstruction work on portions of the unit with the prior written consent of the board of administration.' The board may condition consent on 'the approval of the repair methods, the qualifications of the proposed contractor, or the contract', and 'A unit owner must obtain all required governmental permits and approvals before commencing reconstruction.'

Source: The Florida Senate, 2025 Florida Statutes, Chapter 718 Condominiums, section 718.111(11)(g)1, accessed 2026-09-23

Miami-Dade County's permit exemptions page says that beginning July 1, 2026, Florida House Bill 803 lets certain work valued under $7,500 on single-family homes, duplexes and townhouses proceed without a building permit. 'Units in multi-family buildings do not qualify', properties partly or entirely within a flood hazard area are not eligible, electrical, plumbing, structural, mechanical and gas work always requires a permit, and a project cannot be split into phases to avoid permitting.

Source: Miami-Dade County Regulatory and Economic Resources, Permit Exemptions, accessed 2026-09-23

Section 468.8419(1)(d) says a person may not 'perform or offer to perform any mold remediation to a structure on which the mold assessor or the mold assessor's company provided a mold assessment within the last 12 months.' Section 468.8419(2)(d) is the mirror rule, barring a remediator from assessing a structure it remediated within the last 12 months. Under 468.8419(3) a violation is a second degree misdemeanor the first time, a first degree misdemeanor the second time and a third degree felony after that.

Source: The Florida Senate, 2025 Florida Statutes, Chapter 468 Part XVI, section 468.8419 Prohibitions; penalties, accessed 2026-09-23

Licensed and insured, and you can checkFlorida issues separate Mold Assessor and Mold Remediator licenses. Ask whoever comes out for the number and look it up with the state.
Assessor and remediator never share a jobFlorida bars one company from doing both on a structure within 12 months. We keep them apart even where the law makes an exception.
Your claim stays yoursA residential policy issued from 2023 cannot have its post-loss benefits assigned. Nobody introduced here will ask.
In The Field

What mold remediation involves in Miami

Local Context

What comes out of a Miami unit, and which office files the rebuild

The removal is the part of the job that runs into other people's rules. A Miami mailing address covers more than the City of Miami, and the Property Appraiser's folio chart gives the city code 01 while unincorporated land carries 30, so the rebuild after a removal can belong to two different building departments on neighboring blocks. Nearly half the city's housing, 48.8 percent, is in buildings of 20 or more units, which puts most removals inside a condominium or a rental tower where the board and the manager have a say before a saw comes in. Get both answers before the containment goes up.

Condo hallway utility closet with an air handler, condensate pan, and faint floor stain
Next Step

Do you know the Miami folio's first two digits?

Include them if you do, with the building type and what the protocol says has to come out. If you have no protocol yet, say so.

Questions

Removal questions from Miami renters and condo owners

Who arranges a removal in a rented City of Miami unit?

Normally the owner of the unit, because the walls are theirs, and in a condo the board's consent to reconstruction runs to the unit owner, not the tenant. What a tenant can do is send the landlord a dated written description with photographs, and keep a copy. If the owner wants a scope, a separate assessment provides one.

Does the whole Miami apartment have to be sealed off?

Rarely. Containment is built to the area the protocol marks, so an AC closet job can stay an AC closet job. In a tower, ask the manager where debris can be carried and whether the service elevator needs booking, because bagged material leaves through the building's common areas.

Next Step

Tell us what has to come out of the Miami unit

A person reads it and writes back with the order of work, the board and the permit office included. No one books anything on your behalf.

Start Your QuoteCall (315) 640-3590
Start Your Quote